We started work on the Castle straight away. In charge Boss (Kirra's Dad) with Mrs Boss (Kirra's mum) by his side and trusty side-kick Boss Junior (Kirra's little brother) was roped in to help aswell. (Boss Jr. will probably kill me for not only uploading this photo of him to our blog but also to facebook. Whoopsy!)



The first step was to re-stump & level the flooring in the the front of the house which included the master bedroom, kitchen & lounge room. We pulled up some of the floor boards in the kitchen to gain access to below the house.

 The "Man Cave" under the house 

Boss brought in a laser level which spins around putting a level line around the walls to see how much we would have to raise the floor to be back in level.
The only problem with the spinny-roundy level was if there's too much movement in the room, it would stop and reset itself... So much fun with an almost 2 year old running around in the house.


Red laser level line around the lounge room*

Once all the rooms in the front of the house had been marked on with a level line then began the task of slowly raising the house millimetre by millimetre back into alignment.
 *Just to clarify, the laser line around the room isn't how high the house needed to be raised.
We worked out the common level in all the rooms and raised the floor to where it needed to be.

While the boys were measuring, cutting & placing stumps, Mrs Boss & I were mixing concrete by hand shovel. Definitely not the easiest way to do it but we had some laughs when we accidently splashed each other with concrete. Warning! Do not get it in your eyes! IT HURTS!

Brad & Boss Junior cutting stumps


Brad putting a stump in


Concreting the stumps in




Mrs Boss mixing the concrete